Problem:
Our clients needed reliable a practice field for their child’s little league baseball team. With an ample side yard they decided to build instead of looking for a local field that was properly maintained and available when their team needed it.

Project Information
Estimated Project Cost (2017): ± $35,000
Estimated Project Duration: 3 days total
Project Location: Freehold NJ
Completion Date: 09/17/2017
Schedule Your Free Estimate
The Solution
With an abundance of land on the side of their property our lead designer and resident baseball fanatic went to work. He designed, laid out, and helped build a regulation size little league infield. To help protect the house a removable baseball netting system was devised to be used when the kids are on the field.
Materials Used
- 8,200 sq. ft. of sod.
- 45 tons of recreational grade infield mix (70-75% sand, 25-30% silt/clay)
- 175 ln. ft. of pipe and 17 tons of clean blue stone for drainage